mandag 5. oktober 2015

Day 1

Sandvika IKT Service 

The furte ting i do is to get in the enterens 08.00.
Skjerm som skal ned på lager
Screen that is gone go to the beiment
1.Start to unbolt the screen and lay it on the cart.

Screen to be down on stock
So I have to tape the screws I have robes out from the screen because they do not adhere where the screws were at before.

2. After I had packed open a package that came about earlier today so I set them up and and package them in a package instead of having them in weather say box. After that I went to took the garbage down the garbage room.


This is the key to the key 

This is a key that you manually install the rights to it and the key is to have.
But we have so clearly going to be easy door to key in my key to work on the door.
So after I had writing on Boggs tokk we manually enter keys which means that I have access to the doors of the school.
  In the same way up did I helped to kjfte password pc one. and when he came on the internet and got searched vg.no.
Dis is the pc equipment


This is HP accessories that we have received as a small HP hard drive to be used for pc, we also got pc mouse, keyboard and charging it in a double set.








 Then I had food.






MY PC 



 


Day 2
I started the day by getting a new pc.
I need to set up several programs in which I will use on the job in retrospect.

So after I had loaded the programs then I thought 4 MAC PC from 2010 also load programs HMS school use and have the PC. It took a gooooood time on the first pc but it was easier with the next 3 PCs.

MAC

So after that I shift black color on the copier in room 33.10 it went pretty smoothly.



Then there was a problem with the PC I got because I did not have access to everything I school have access to then had second-boss get help from the municipality and it got him to take the picture of the problem and send it to them and then it was fixed.






Problem
















Ingen kommentarer:

Legg inn en kommentar